JX Pro Mk.3

The industry-leading JX25-8 Piling Rig has reached a new milestone with the introduction of the JX Pro Mk.3 control system. While the rig remains the same rugged, reliable workhorse the industry trusts, the new UI/UX featuring real-time remote monitoring is the icing on the cake – delivering a more intuitive interface, pinpoint accuracy, and a faster learning curve for operators.

Intelligence at Your Fingertips

The Mk.3 update introduces a completely redesigned interface. With a focus on improved UI/UX, the generous 10-inch touch screen delivers high-contrast, intuitive graphics that are readable in even the harshest sunlight.

This upgrade is centred on simplifying the complex. The streamlined layout makes it easier to train new operators and empowers veterans to achieve even more consistent results. By matching energy output perfectly to soil conditions, the system ensures exceptional piling accuracy. Furthermore, integrated live remote monitoring and advanced data logging allow you to track every blow. Capture hammer performance and penetration rates instantly, then output PDF reports for seamless quality control and project documentation.

New JX Pro Mk.3

  • Streamlined Setup and Transport: The Mk.3 system simplifies the rig’s self-erecting and folding sequences. By automating key synchronisation steps through the new interface, transitioning from transport mode to fully operational is quicker, easier, and safer, significantly reducing the time spent on-site during mobilisation and demobilisation.
  • Precision Piling Accuracy: The enhanced UI provides real-time digital readouts of hammer performance, including stroke and energy levels, allowing operators to match impact energy perfectly to soil conditions and pile requirements.
  • Live Remote Monitoring & Support: Site supervisors and fleet managers can view a live mirror of the piling interface from any remote location, providing real-time oversight of hammer performance, blow counts, and pile penetration. For ultimate technical support, the system allows remote access to the I/O (Input/Output) diagnostics screen, enabling engineers to monitor hardware health and perform live troubleshooting without stepping foot on site.
  • Advanced Data Logging & Reporting: Capture every blow with the integrated pile monitor. This system records hammer performance and pile penetration rates, allowing for instant data transfer via the modem/antenna/network or removable USB, for comprehensive quality control and documentary records. Back at the office, the dedicated desktop app generates comprehensive, graph-integrated reports in a professional layout. These "submission-ready" PDF records provide a visual and tabular history of every pile, ensuring your quality assurance documentation meets the most stringent regulatory and engineering standards.
  • Ruggedised Operator Comfort: Inside the cab, the JX Pro Mk.3 pedestal mount features a dual ball-joint system for full multi-axial adjustment. This allows the operator to instantly eliminate glare and secure the perfect ergonomic viewing angle, regardless of seat position.
  • Comprehensive Safety Suite: The system features integrated safety interlocks, emergency stop functionality, and signal interference protection. Digital “red light” alerts instantly notify the operator of any mechanical or hydraulic abnormalities, reducing the probability of equipment damage.
  • Optional Radio Remote Control: Elevate site safety with a wireless control system that allows the operator to step out of the cab for a superior vantage point. This mobility eliminates blind spots and ensures the safest, most strategic positioning during complex lifts and drives.

The UK’s Construction Site Specialist

The JX25-8 remains the UK’s No. 1 choice for construction site piling projects. Its unique lightweight class – with an operating weight of just 28.6 tonnes – allows for low ground pressure (82kN/m²) and easy transport on a single low-loader without removing the hammer.

  • JX Pro Mk.3 Control: Improved ergonomics for reduced operator fatigue, enhanced UI/UX, remote monitoring and diagnostics, and desktop app for PDF reports
  • Easy transport, mobile and self-erecting
  • Capable of driving steel, wood or concrete piles up to 8m in length
  • Extreme strength: High-strength boom and mast designed to handle the most demanding piling schedules
  • Double acting cylinder: Hydraulically accelerated piling hammer
  • High impact energy and fast blow rate
  • Advanced engineering: Finite Element Analysis (FEA) ensures the longest possible service life for all key structural components
  • Cast steel ram: The drop weight is manufactured from high-grade cast steel, chosen for superior impact resistance and long-term durability
  • Economical: Low hydraulic power requirements

Flexible Finance: Ownership is made easy with tailored JCB Finance packages

The Power of the JCB 220X

Built on the world-class JCB 220X-LC base, the JX25-8 offers a cab environment that is second to none. The CommandPlus cab provides best-in-class comfort with reduced noise levels (67dB) and double-cushion viscous mounts to dampen vibration.

Ready to Upgrade Your Fleet?

Experience the future of piling today. For more information on the JX Pro Mk.3 controls and the JX25-8, or to discuss JCB Finance options, contact our sales team at BSP-TEX.


< Back