48 Years of Foundation Innovation: Meet Adrian Cooper

From apprentice to Chief Technical Officer, Adrian Cooper shares how 48 years of British engineering excellence shaped global infrastructure projects and the new JX Rig.

Part 1: The Apprentice’s Journey

Adrian, you started your career as an apprentice right here at BSP-TEX and have served for over 48 years. Looking back, how did that early, hands-on engineering foundation shape your approach to product design and how you guide the engineering team today? 

At the time I started, BSP had a separate R&D division. Due to a vacancy on the controls side, I was quickly co-opted from the fitting shop to that section. This was during the time BSP was developing hydraulic hammers and were the first to launch a commercially viable offering into the market. That was the HH357 model and the basis from which following models were derived. It was a good hands-on introduction to engineering and product development without the formalities of production-line equipment being built by the regular workshop. There was freedom to do prototypes and suffer ‘trial-and-error’ (you often learn more from your ‘errors’ than successes!). It was both a hands-on practical team while also doing the technical drawings.

In the 80’s, I joined the drawing office, where I developed more formal drafting skills and learned production routines from experienced senior designers. No one is an island; we stand on the shoulders of others.

From local developments to landmark international infrastructure, your work has a massive global footprint. What are some of the most memorable challenges you faced when designing custom solutions for iconic projects like the London Eye or major international sea defence systems? 

While our equipment is very noticeable – i.e. loud – what it does is largely unseen. We either put piles into the ground, drill holes, or improve the soil itself at the foundation level. Therefore, we tend to be on site at the very early stages of development; before the glamourous parts of a construction are seen. For example. I remember drilling holes inside an old London district where the Victorian façade was retained (supported with scaffolding) while the inside was gutted and foundations re-done. Then another job in a dead-flat part of the Middle East was to put our ground improvement kit to work; first compacting at ground-level, then building a ‘mountain’ in 4m lifts until it peaked at 30m high. The local authorities could then build a new cultural city where all the villas could have a good view of the sea.  

Heavy machinery manufacturing has evolved dramatically since you joined the drawing office. What was it like transitioning the team from traditional manual drawing boards to advanced and modern 3D CAD modelling? 

When I started, everything was done on manual drafting boards. Harder work, standing most of the day, but you could work in a power outage (and no IT hassles to worry about). When moving on-screen we first used a 2D CAD package. The principles of laying out and dimensioning drawings remained much the same – the main difference was that we could sit down! The move to 3D CAD modelling was a gamechanger. Now you could take what was being designed and rotate, spin, cross-section through it. Once you get the hang of it, you could really start to design things in a virtual way that is like how the people on the shopfloor fabricate and machine them. 

Having travelled all over the world to support big construction and infrastructure projects, what is the single biggest lesson you’ve learned about what field operators truly value in heavy piling equipment? 

We differ in many ways to other agricultural and construction equipment in that ours is very self-destructive by the nature of what it does. That means we must build to a ‘brick-chicken-house’ standard to make the equipment lasts. Customers much prefer kit that does not break at all; but when it inevitably does, a quick response and good solution is appreciated. Which is why I find it very beneficial merging both a design role with sales and after-sales to give the best in customer service. That hybrid role is somewhat unusual and developed organically over the years.

Part 2: Industry Evolution, Technology, and Breakthrough Innovations

You have witnessed nearly five decades of transformation in deep foundation methods. How have heavy construction industry demands shifted regarding pile-bearing capacity, operational safety, and environmental noise regulations? 

Sites are much more organised and ‘safe’ these days. We live in a much more litigious society now and Health & Safety is at a much higher level. I can remember going around on sites with service guys in quite ordinary company cars. Got to be vans or 4x4’s these days.

Safety practices first established in Europe and the UK have increasingly influenced standards worldwide. When I first visited a site in China 25 years ago, I arrived in steel-toe-capped boots and overalls while some local workers wore open-toed sandals – a striking contrast that showed how different site-safety practices were at the time. Since then, awareness and standards across China, the Middle East and Asia have advanced significantly.

The sizing of piles is much more precise these days too. An old BSP alumni Alfred Hiley led the way in predicting pile capacity based on the effort needed to get it in the ground and the ‘final set’ of the pile driver. There was a large factor of safety built into those estimates, so piles were maybe larger than necessary. As time went on engineers developed wave-equation theory to better predict soil behaviour. During the R&D of the 80’s, BSP had links to a professor at Queen Mary school of engineering. At that time, we were developing a 40T hammer and there was some collaboration and insight into what was involved in wave theory and pile driving prediction. It was the Americans and Dutch who took that type of software and made it a commercial proposition so that today piles can be designed to suit the soil conditions much more closely.

You were instrumental in developing the ground-breaking Rapid Impact Compactor (RIC) technology. Can you take us behind the scenes of that development cycle and explain how it revolutionised shallow ground improvement techniques globally? 

This had its roots in the Cold War. It started in the 80’s with a military goal; that of quickly repairing bomb craters on airfield runways. The old system of ‘dynamic compaction’ with a large weight dropped from a crane was not so convenient for army use. The BSP HH357 was adapted for impacting onto a ‘Foot’ to compact fill material down in the craters. Eventually this was mounted on a large, armoured, centre-steer wheeled loader. That culminated in a dozen machines being sold to the British MoD at the turn of the century. But that had only small market potential. BSP, together with a government building research outfit – BRE, saw a benefit in repurposing the kit for civilian use. Sometimes new designs come together quickly, and in just a couple of days the concept of mounting that same equipment on a short stub boom anchored to a regular excavator base was conceived. A style that is still used today.

At first, it was seen as a competitor to the larger Dynamic Compaction equipment. That was not accurate because they both have their roles and are complimentary. The difficulty was getting the construction world to acknowledge the system and adopt it. The system bridged a gap in the market in that it could rapidly densify loose granular soils, particularly on brownfield sites, without the massive infrastructure, footprint or safety hazards of dropping huge weights from immense crane heights. 

For the first 10 years of the new century, we had a handful of ‘pioneer’ customers who took the process around the world. Often competing against the ‘big boys’ until they too recognised its worth and became our customers. It is now an industry standard procedure in the ground improvement world. It also led to the development of better hammer and ground performance monitoring and later GPS positioning to aid reporting and process control.

When looking at modern hydraulic piling hammers versus early steam-powered or diesel drop hammers, what have been the major breakthroughs in hydraulic efficiency and blow rate controllability? 

I joined BSP near the end of its steam and diesel era. Those hammers did the job but typically transferred only about 50% of their potential energy to the pile. Earlier pile driving relied on a rope and drop weight – a slower method with relatively little energy loss. Hydraulic hammers adopted the same drop-weight principle but improved it through efficient oil handling built into the cylinder, enabling our hammers to achieve efficiencies of up to 90%.  

Part 3: Under the Hood of the JX Rig

We are standing in front of your latest product out of development: the JX Piling Rig. When you sit down with a blank sheet of paper to design a machine like the JX Rig, what is the number one problem on a construction site you are trying to solve for your customers? 

To succeed in a traditional market that is slow to change, a new product must offer a clear advantage. BSP has developed piling rigs over the years, drawing on its extensive expertise in piling equipment. The JX Rig originated from a customer request and addresses a specific market need. The UK uses many short sectional piles, yet conventional piling rigs are often larger than necessary for this work. Their additional weight also requires significantly more ground preparation to create a suitable piling platform.

We looked at the excavator size needed and considered the JCB 22T base combined with our already-proven DX hammer could be put together to create a rig around the 30T mark. The geometry of the mast was kept as simple as possible and we ended up engineering a highly mobile, compact, self-erecting piling rig that could drive onto a low-loader in transport mode, arrive at a tight urban jobsite, and be fully operational within minutes – all while delivering the driving force of the larger, traditional machines.

Having done a lot with the various control systems on our hammer over the years, including those early piling rigs, I like to think we’ve arrived at a layout in the cab that ergonomically gives the operator a very comfortable layout, easy to operate without cluttering up the cab too much.  

What are the benefits of the new JX Pro Mk.3 controls? 

The latest JX rig Mk.3 control system takes the good ergonomics a step forward and with a slightly larger display, adds to it pile monitoring and recording capability. By collaborating with a software provider well established in our industry, we’ve added the ability to monitor pile depth and record the pile penetration as the pile is driven. We also have the ability to add remote control to the rig for those customers that want to have their driver operating outside of the cab, which can be seen as more efficient and can get more piles in the ground per shift. Through the system’s modem, there is also the ability for remote office-based observation and transfer of data, again improving the all-round customer experience.


< Back