CG210
The CG210 piling hammer is designed for driving a variety of bearing piles including steel tube, combipiles, H-sections, raked/batter piles and reinforced/prestressed concrete piles and can be operated from piling rig leaders or crane suspended.
Important features of the CG210 include total control of hammer stroke and blow rate, and precise matching of energy to suit the relevant pile driving requirements. This
large-capacity hammer is capable of driving piles with an ultimate load bearing capacity of up to 16600 kN.
Drive cap dolly changing is quick and easy, and cylinder and drop-weight connection with shock absorber is easily accessible for routine maintenance.
CG hammers are economical to operate because they have a low hydraulic power requirement. For optimal performance, use CG hammers with BSP-TEX Hydropacks.
-
Total control of hammer stroke and blow rate
-
Allows precise matching of energy to suit the pile driving requirements
-
Quick and easy dolly changing
-
Cylinder and drop-weight connection with shock absorber is easily accessible
-
Economical, low hydraulic power design
-
Available with BSP-TEX Hydropacks for optimum hammer performance
-
Suitable for driving raked (batter) piles
Model | CG210 |
---|---|
Dropweight Mass (kg) | 14000 |
Hammer Energy (kN.m) | 210 |
Max Equivalent Stroke (m) | 1.50 |
Operating Pressure (bar) | 240 |
Hyd Oil Flow required (L/min) | 380 |
Blow Rate at rated energy (bpm) | 36 |
Basic Hammer Length (mm) | 6600 |
Basic Hammer Weight (kg) | 19350 |
Operating Mode |
FS PR |
Pile Type |
TH CW CP |
Maximum Pile Size (mm) | 2100 |
Power Source |
PP |
Max Pile Bearing Capacity (kN) | 16600 |
Files | Datasheet |
Get a Quote